WMATA Rosslyn traction power substation cable tray replacement

WMATA Rosslyn Traction Power Substation Cable Tray Replacement

Projects / WMATA Rosslyn Traction Power Substation Cable Tray Replacement

WMATA Rosslyn Traction Power Substation Cable Tray Replacement

Client:

Washington Metropolitan Area Transit Authority (WMATA)

Owner:

Contract Value:

Caliber’s Scope:

Traction Power Systems, Communications Systems, Electrical Systems, Construction In Active Rail System

Completion Date:

2022
WMATA Rosslyn traction power substation cable tray replacement

Project Scope

In conjunction with this contract to upgrade WMATA Traction Power Systems on the Red, Green, and Orange metro train lines in the Washington, DC area, C3M will install electrical equipment at five tie breaker stations and eleven traction power substations to accommodate the additional power capacity required for the 100% 8-Car Train and State of Good Repair programs. Clark Civil is part of the project and will be installing concrete pads in every location.