Skip to Main Content
WMATA shafts repair

Vent Fan Shaft Rehab Design-Build

Projects / Vent Fan Shaft Rehab Design-Build

Vent Fan Shaft Rehab Design-Build

Client:

W.M. Schlosser Co.

Owner:

WMATA

Contract Value:

$316K

Caliber’s Scope:

Safety & Security Certification

Completion Date:

February 2025 - present
WMATA shafts repair

Project Scope

This design-build project includes extensive upgrades to the structural, electrical, drainage, SCADA, and architectural components of six WMATA fan shafts. The work will significantly enhance operational reliability, safety, and efficiency for the railway system and its operators. By replacing aging electrical, structural, architectural, and drainage components, the project will ensure high ventilation performance, which is essential for safe air quality and temperature control within the tunnels. Enhanced structural repairs, waterproofing, and corrosion-resistant materials will improve long-term durability, reducing maintenance needs and downtime. Updated electrical systems and improved lighting and signage will streamline inspections and emergency responses, supporting continuous and safe railway operations while lowering long-term costs for WMATA.

Return to Portfolio

 
This entry was posted in . Bookmark the permalink. Follow any comments here with the RSS feed for this post. Both comments and trackbacks are currently closed.